We have the solution for urgent mould making, it takes ony 15 days for first mold trial. Here is a project for reference:
It is 1+1+1 family mould with 6 cavity insert and 1 slider moving with a hydro-cylinder help .
Product Details:
- Product name: Urgent mould
- Industries: Industrial
- Mold base: LKM
- Steel: H13
- Plastic: POM(Delrin 500P)
- Cavities: 1+1+1
- Runner system: Cold
- Cycle time: 115s
- Tolerance: +/-0.05mm
- Dimensions: 300 X 350 X 400mm
- Mold life: 500,000 shots
- Lead time: 15 days
- Packing: Plywood
T0 sample
Date
The project run since 29th Oct. and first mould trial on 15th Nov., it takes only 15 work days.
Mould Making
Mould making is based on mould design and purchase mould base, steel and component by machined by CNC, EDM, Lathe, Gun Drill and Milling etc., make mould fitting and mould trial in the end. To see the idea into real by mass production.
Mould Trial
Mould trial is the last processing to check if the work is making well. You will get the moulded part to inspection specification. Make decision if it is ok or NG in the end.
Mould Precision Co., Ltd. is a high quality plastic injection mould manufacturer in China, with rich experience in urgent mould design and manufacturing, with competitive price and on time deliver.
Pls contact us if you need urgent mould making.