23 work days of T1 for mould with 35 sets exchange core inserts
Mould Precision Co., Ltd. does a very good job for urgent mould making in China. We are not firemen, but we do a real good job as firemen.
There are 4 pcs exchange cavity and 5 pcs exchange core, with 35 sets exchange core inserts. Every core insert must be fit well with core and cavity in very shot time. It is most important, and it is most difficult too. Luckily it is success when the customer come to see mould trial. Every machined part is good and the moulded part is good too. It is fulled of smile when customer see moulded part.
Mould Design
Mould design is including DFM, Mould Flow Analysis, 2D Mould Layout and 3D Mould Drawing. It is part lay out, part line making, gate design, runner design, gating way, ejection method, cooling layout, etc.
Mould Making
Mould making is based on mould design and purchase mould base, steel and component by machined by CNC, EDM, Lathe, Gun Drill and Milling etc., make mould fitting and mould trial in the end. To see the idea into real by mass production.
Mould Trial
Mould trial is the last processing to check if the work is making well. You will get the moulded part to inspection specification. Make decision if itt is ok or NG after mould trial.